Permit and execution designs of the M8 motorway between Körmend and the Country border

Client: NIF Ltd.

Road designer: Unitef’83 Ltd.

The permit and execution designs of the M8 motorway are being prepared by the Unitef – Főmterv – Utiber – Uvaterv Consortium on behalf of NIF Zrt. The nearly 30 km long route runs parallel to and on the northern side of the existing road No 8.

Our company has been commissioned to prepare the geotechnical documents of the 8.5 km section between Csákánydoroszló – Vasszentmihály (soil investigation report, geotechnical design report). The site investigation works were carried out in 2014. The construction works were completed in 3.5 years between 2018-2021.